Ethmos Podcast Pulse
Start free
← The Pulse · week of Sep 28–Oct 4
PodcastMining Stock DailySeptember 28, 2026

Mithril Silver & Gold Looks to Double Its Resource at Copalquin

Mithril's Copalquin project may double its resource base if Target 4 matches Target 1's scale, pending PEA results.

  • Target 1 upgrade: Mithril moved 75% of its Target 1 resource at Copalquin into the indicated category, supporting an in-progress PEA with results expected by year-end or early 2026.
  • Target 4 emerging: Two rigs are drilling a silver-rich structure linking Target 1 to the historic San Manuel mine, spanning up to 1.5km, seen as potentially matching Target 1 in scale.

The full card is a free trial away.

The full summary and the deep dive on this episode, plus a brief every morning on the shows and companies you follow.

Read free — start your trial

14-day free trial

Themes, sentiment and reasons are AI-written paraphrases, checked so they never quote an episode. They may contain errors. Not investment advice. Episodes remain the property of their creators.